Cardiff Marina
The MOB20 we specified at redevelopment in Cardiff marina, this was used by the building contractor to use around a bank and to prevent any hydraulic oils from machinery seeping into the water. The MOB20 is 100% UK manufactured absorbent boom and is totally manufactured to our specification. The MOB is now used in a great number of marine applications and uses.